- 14 SunPower 230 watt panels
- One SMA Sunny Boy 3000 inverter
- A second digital utility meter
- AC and DC disconnects with lockout-tagout switches.
Here is the equipment after delivery and upacking :
We were supposed to get a Sunny Beam monitoring station, but evidently there are some issues with buggy firmware, so they won't be available until September (more about that later).
So far, roof has been preped, the mounting rails are installed, the conduits are bolted in place, the DC wires are pulled, and the inverter has been bolted down. All that's left is to hang the panels, do the AC wiring, and get the inspection.
The installer crew was supposed to finish that on Friday, but evidently they decided to take the day off. The project manager at EE Solar pitched a fit. Nick, the crew boss, called on Friday to say he was really sorry. I told him that his schedule is his business, but if he can't come when he promised, he ought to let us know. On Moday, I'll ask him to run some extra conduit for ethernet to make amends.